The dam faces weak capability of withstanding heavy floods, which represents a fundamental design or construction failure despite the massive investment and engineering expertise involved.
causalpending
Evidence Quote
“this powerful Dam has remained controversial because of its weak capability of withstanding heavy floods”
Created: 8/13/2026, 7:44:06 AM
My Notes
Loading notes...