Early prototypes had no roof with a large gap in the ceiling during a Las Vegas trade show, it unexpectedly snowed (rare for Las Vegas), water leaked into the unit causing flooding, but the team cleaned and dried it before the show opened without attendees noticing.
factualpending
Speaker
Galliano TeramaniEvidence Quote
“the morning of the show, it snowed in Las Vegas... we ended up with snow on the roof, the sun came up, it melted, it started uh, flooding the whole unit... I was up there with like a broom at like 6:00 in the morning trying to broom all the all the the snow off, but we ended up getting it dried off and cleaned up, and the show opened, and and no one noticed.”
Source
Factory Tour at BOXABL Building ADU's and Prefab Tiny Homes for Billionaires— Dave Cooper LIVECreated: 8/13/2026, 7:45:08 AM
My Notes
Loading notes...