The terrain at Palos Verdes is extremely rugged, requiring man-portable drilling equipment with motors split into three 50-kilogram pieces connected with hydraulic hoses; pad construction required clearing a steep slope into a flat 5x5 meter pad.

factualpending

Speaker

Alan (Prismo Metals CEO)

Evidence Quote

drilling off the side of a cliff...the motor is even set into three three parts...50 50 kilo uh pieces

Source

Uranium News, SMRs, and Major Setbacks + Prismo Metals CEO InterviewResource Talks
Created: 8/13/2026, 9:51:20 AM

My Notes

Loading notes...